My Profile
Active Members
TodayLast 7 Days
more...
Awards & Gifts
Online Exams
Fresher Jobs
Our fresher job section is exclusively for fresh graduates! Find jobs for freshers in major Indian
cities including Bangalore, Chennai, Hyderabad, Pune or Kochi
Resources
Find educational articles, blogs, discussion threads and other resources.
Colleges
Find details about any college in India or search for courses.
|
Download Model question papers & previous years question papers
|
Posted Date: 03 May 2008 Posted By: S.Yamini Member Level: Diamond
|
2006 Indira Gandhi National Open University (IGNOU) M.B.A Business Administration Management Programme Question paper
MANAGEMENT PROGRAMME Term-End Examination
December, 2006
MS5 : MANAGEMENT OF MACHINES AND MATERIALS
Time: 3 hours Maximum Marks: 100 (Weightage 70%)
Note : Section A has five questions that carry 20 marks each. Attempt any three questions from this Section. Section B is compulsory and carries 40 marks. SECTION A
1. (a) Explain the meaning and importance of plant layout decision. Flow does It improve productivity?
(b) Product X sells for Re. 100 each and Y sefls (or Rs. 120 each. Product K has fixed casts of Rs. 20,000 per year and variable co5t of P.s. 12 per i.e-ut, wtiereas product V has fixed costs of P.s. 8,000 and variable cost of Rs. 40 per unit. At what production rate (volume) are the profits from both producteequal? 10+10
2. (a) Define FMS What Is (he general field of FMS application slgnlhcant In terms of the potential market size for its capability ? State with reference to any Production unit.
(b) The following table contains information regarding jobs that are to be scheduled through one machine:
Job Processing Time (Days) Due Date A 4 20 B 12 30 C 2 15 D 11 16 E 10 18 F 3 5 G 6 9
Sequence the jobs using (I) Shortest Processing Time (SPT) (ii) Processing with due dates
Assume the list is by order of arrival. For each of the methods, determine the average job flow time. average lateness and average niaiiber of jobs t the work centre. (10+10)
3. (a) Four different organisatlons are considering your home town as a potential location for one of the following:
(I) A medical research centre (ii) A soft-drink producer (iii) A steel plant (iv) A software producer
Select any one of the above four and systematically evaluate the relevant locational factors.
(b) A manufacturing company has an expected usage of 50.000 units of a certain product during the next year. The cost of processing an order Is Rs. 20 and the carrying cost per unit Is Rs. 050 for one year. Lead time on an order is fIve days and the company keeps a reserve supply of two day’s usage.
Calculate:
(I) The economic order quantity, and (ii) The re-order point (Assume 250 days year) (10+10)
4. (a) A worker fri a manufacturing industry is expected to work foe a minimum of 400 minutes, In an 8-how shift. The remaIning 80 minutes are meant for his personal and rest needs.
Calculate the following:
(I) Standard time per piece of a job whose normal time is 10 min. (II) Number of pieces to be produced per day. (III) Efftciency of worker for 36 jobs he produced in a shift
(b) There are six Jobs, each of which is to be processed through the machines and M2 In order M1 M2. The processing time Is given In hours, Determine the sequence of these jobs which minimizes the total elapsed time. Also, calculate the Idle time for both machines. (10+10)
Job Number Processing Time on M1 Processing Time on M2 1 5 8 2 9 4 3 4 8 4 7 3 5 8 6 6 5 6
5. (a) Discuss with suitable examples, the rok of the Operations Manager In toda’s context Do you agree that operations management is a mufti-dlsciplinanj function ? Discuss.
(b) A small manufacturing facility is being planned that will teed parts to four ,nanufactunng facibties. The location of the current plants with their co-ordinates and volume requirements Is given in the blowing table.
Plant location Coordinates (x, y) Volume (parts per year) Location A (300, 400) 4000 Location 8 (360. 430) 5000 Location C (200, 350) 6000 Location D (450, 500) 3000
Use the centre of gravity method to determine the best location for this new facilIty. (10+10)
SECTION B
6. A reactor and storage tank are connected by a 75 cm insulated process line that needs periodic replacement. There are valves along the lines as well as the terminals and they need replacemeni as well, No pipe and valves are La stock Their drawings are available, The line is overhead arid requires scallolding. Pipes can be fabricated at the plant. An adequate craft Labour is available The plant methods standard section has furnished the following data
Activity Time (Hrs) Predecessor(s) A-Develop required material list 10 -- B-Procure pipe 200 A C-Erect scaffold 15 -- D-Remove scaffold 5 H,L E-Deactivate line 10 -- F-Prefabricate sections 40 B G-Place new pipes 35 F,K,I H-Fit up pip and valves 10 G,J I-Procure valves 220 A J-Place valves 10 I,K,F K-Remove old pipes and valves 40 C,E L-Insulate 25 G,J M-Pressure Test 8 H N-Clean-up and Start-up 5 D,M
(a) Draw the network diagram of this project plan. (b) flnd the critical path and its duration. (20)
7. Wrile short notes on any four of the following: (4x5=20)
(a) Operating Characteristic Curve (b) Delphi Tedinlque (c) ABC Analysis (d) Robotics (e) Balance delay (f) Job enrichment
Return to question paper search
|
|
|
Submit Previous Years University Question Papers and make money from adsense revenue sharing program
Are you preparing for a university examination? Download model question papers
and practise before you write the exam.
|
Advertise Here
|