My Profile
Active Members
TodayLast 7 Days
more...
Awards & Gifts
Online Exams
Fresher Jobs
Our fresher job section is exclusively for fresh graduates! Find jobs for freshers in major Indian
cities including Bangalore, Chennai, Hyderabad, Pune or Kochi
Resources
Find educational articles, blogs, discussion threads and other resources.
Colleges
Find details about any college in India or search for courses.
|
Download Model question papers & previous years question papers
|
Posted By: b.thirumaya prabhu Member Level: Gold Posted Date: 21 May 2008
|
2007 Anna University B.E Computer Science TQM -ME1401 Question paper
B.E/B.Tech. Degree Examination, November/December 2007 Seventh Semester (Regulation 2004)
Computer Science and Engineering
MG 1401 - Total Quality Management
Part-A(10*2=20 marks)
1. Write the equation that would quantify quality.
2. What is meant by vision statement ? Write a sample one-sentence vision statement.
3. Draw the figure to depict customer satisfaction model.
4. Expand 5S.
5. In a foundry, the castings manufactured are inspected with respect to the four defects namely, blow holes,core shift,honey combing and hot tear design. Design a check sheet to gather data on the total number of castings found defectives due to the respective above defects.
6. A spindle with specifications 20+0.05mm or 20-0.05mm was machined in a lathe. The standard deviation of the spindle machined was found to be 0.25mm. Compute the capability index. State whether the machining process in the lathe is capable of meeting the specifications.
7. Indicate any two strengths and weaknesses of benchmarking technique.
8. If the specificatins are 10+2 or 10-2 for a particular quality characteristic and the average repair cost is Rs.200, Determine the loss at y=11.
9. Draw the model of process based quality management system given in IS) 9001:2000.
10.Differentiate TS 16949 and ISO 14001 standards.
Part-B(5*16=80 marks)
11. (a) (i) Indicate the dimensions of quality with examples. [8]
(ii)Enumerate the duties of quality council. [8]
(OR)
(b) Enumerate Deming's 14 points of management. [16]
12. (a) (i) Enumerate any eight actions that an organizations shall take to handle complaints. [8]
(ii)Describe briefly any eight concepts to achieve a motivated workforce in an organization. [8]
(OR)
(b) (i) Indicate any two items that can be measured under the following titles in an organization: (1) Human resources (2) Customers (3) Production (4) Research and Development [8]
(ii)Describe briefly any eight criteria that need to be considered while developing performance measures in organizations. [8]
13. (a) Following table contains the data on the weight of a plastic component in grams. This component is manufactured using a plastic injection molding process. Mean and range charts are required to be established for this process. Determine the trial central line and control limits. Draw the mean and range charts and plot the values. State whether the process is under statistical control. If not, assume that the deviation occurred due to assignable causes which are rectified now.Revise the central line and control limits. Draw the revised mean and range charts and plot the values. State whether the process is now under statistical control. [16]
Sample Measurements Number X1 X2 X3 x4 1 6.35 6.40 6.32 6.37 2 6.46 6.37 6.36 6.41 3 6.34 6.40 6.34 6.36 4 6.69 6.64 6.68 6.59 5 6.38 6.34 6.44 6.40 6 6.41 6.40 6.29 6.34 7 6.38 6.44 6.28 6.58 8 6.35 6.41 6.37 6.38 9 6.56 6.55 6.45 6.48 10 6.38 6.40 6.45 6.37
(OR)
(b) Describe the characteristics and applications of the following four new seven management tools (i) Affinity Diagram (ii) Interrelationship diagraph (iii)Matrix Diagram (iv) Process Decision Program Chart [16]
14. (a) (i) Draw the general structure of 'House of Quality' and indicate the constituents in it. [8]
(ii)Explain briefly the QFD process. [8]
(OR)
(b) (i) What are the six major loss areas that are measured,tracked and measured in a TPM program ? Indicate the method of measuring any two of these major lossses. [8]
(ii)List the four stages of FMEA and indicate the activities carried out under each stage. [8]
15. (a) Consider a company involved in testing the strengths of components. Currently 50 engineers are working in the company. Explain briefly the steps that the company should take to implement ISO 9001:2000 based quality system and obtain the certificate from a certifying agency. [16]
(OR)
(b) (i) With the aid of a pyramidal diagram, describe the documentation hierarchy stipulated in ISO 14001 standard. [8]
(ii)Enumerate any eight key organization benefits achievable on implementing ISO 14001 based system. [8]
Return to question paper search
|
|
|
Submit Previous Years University Question Papers and make money from adsense revenue sharing program
Are you preparing for a university examination? Download model question papers
and practise before you write the exam.
|
Watch TV Channels
|