Learn more about IndiaStudyChannel
Install Alexa Toolbar
and earn more...
 
Communities Members BookmarksPolls Fresher Jobs Strange Photos Academic Projects New Member FAQ  



My Profile
Active Members
TodayLast 7 Days more...



Awards & Gifts
Online Exams

Fresher Jobs


Our fresher job section is exclusively for fresh graduates! Find jobs for freshers in major Indian cities including Bangalore, Chennai, Hyderabad, Pune or Kochi

Resources


Find educational articles, blogs, discussion threads and other resources.

Colleges


Find details about any college in India or search for courses.

website counter



Download Model question papers & previous years question papers

Posted By: b.thirumaya prabhu       Member Level: Gold       Posted Date: 01 Jun 2008

2007 Anna University Mechanical B.E/B.TECH DEGREE EXAMINATION,NOV/DEC 2007 MG1401-TOTAL QUALITY MANAGEMENT Question paper



Course: B.E Mechanical   University: Anna University




B.E/B.TECH DEGREE EXAMINATION,NOV/DEC 2007
MG1401-TOTAL QUALITY MANAGEMENT
Time:3 hours
Maximum marks:100 marks
Use of statistical tables is permitted

PART A
(10*2=20marks)

1. Write the equation that would quanify quality

2. What is ment by vision statement? Write a sample one-sentence vision statement.

3. Drw the figure to depict customer satisfaction model.

4. Expand 5S.

5. In a foundry, the castings manufactured are inspected with respect to the four defects namely
blow holes, core shift, honey combing and hot tear design. Design a check sheet to gather data
on the totl number of castings found defectives due to the respective above defects.

6. A spindle with specifications 20 + or - 0.05mm was machined in a lathe. The standard
deviation of the spindle machined was found to be 0.25mm. Compute the capability index. State whether the
machining process in the lathe is capable of meeting the specifications.

7. Indicate any two strengths and weakness of benchmarking technique.

8. If the specifications are (10 +- 2) for a particular quality characteristic nd the average repair
cost is Rs.200/-, determine the loss function. Determine the loss at y = 11.

9. Draw the model of process based quality management system given in ISO 9001:2000.

10. Differentiage TS 16949 and ISO 140001 standrds.


PART B (5 x 16 = 80 maks)

11. (a) (i) Indicate th dimensions of quality with examples. (8)

(ii) Enumeate the duties of quality council. (8)

OR

(b) Enumerate the Deming's 14 points of management. (16)

12. (a) (i) Enumerate any eight actions that n orgnisation shall take to handle complaints. (8)

(ii) Describe briefly any eight concepts toachieve a motivated workfoce in an organization. (8)


OR

(b) (i) Indicate any two items that cn be measured under the following title
in an organization: (1) Human resources (2) Customers (3) Production
(4) Research and Development. (8)

(ii) Describe briefly any eight criteria tht need to be considered while developing
performance measures in organizations. (8)

13. (a) Following table contains data on the weight of a plastic component in grams. This
component is manufactured using a plastic injection molding process. Mean and range
charts are required to be established for this process. Determine the trial
central line and control limits. Draw the mean and range charts and plot the
values. State whether the process is under statistical control. If not, assume that
the deviation occurred due to assignable causes which are rectified now. Revise
the central line and control limits. Draw the revised mean and range charts and plot the
values. State whether the process is now under statistical control. (16)


Sample Number Measurements

X1 X2 X3 X4



1. 6.35 6.40 6.32 6.37

2. 6.46 6.37 6.36 6.41

3. 6.34 6.40 6.34 6.36

4. 6.69 6.64 6.68 6.59

5. 6.38 6.34 6.44 6.40

6. 6.41 6.40 6.29 6.34

7. 6.38 6.44 6.28 6.58

8. 6.35 6.41 6.37 6.38

9. 6.56 6.55 6.45 6.48

10. 6.38 6.40 6.45 6.37

Or

(b) Describe the characteristics and applications of the following four new seven
management tools (i) Affinity diagram (ii) Interrelationship diagraph
(iii) Matix diagram (iv) Process decision program chart (16)

14. (a) (i) Draw the general structure of 'House of Quality' and indicate the constituents in (8)
it.

(ii) Explain briefly the QFD process. (8)

Or

(b) (i) What ae the six major loss areas that are measured, tracked and measured in a
TPM program? Indicate the method of measuringm any two of these major losses. (8)

(ii) List the four stages of FMEA and indicate the activities carried out under each
stage.

15. (a) Consider a company involed in testing the strengths of components. Currently 50
engineers are working in the company. Explain briefly the steps that the company
should take to implement ISO 9001 : 2000 based quality system and obtain the (16)
certificate from a certifying agency.

Or

(b) (i) With the aid of pyramidal diagram, describe the documentation hierarchy
stipulated in ISO 14001 standar4d. (8)

(ii) Enumerate any eight key organization benefits achievable implementing ISO 14001
based system. (8)



---------------





Return to question paper search

Next Question Paper: STRATEGIC MARKETING MANAGEMENT

Previous Question Paper: B.E/B.TECH DEGREE EXAMINATION,NOV/DEC 2007 MG1401-TOTAL QUALITY MANAGEMENT

Related Question Papers:


  • Engineering Physics


  • PRINCIPLES OF MANAGEMENT


  • COMMUNICATION ENGINEERING


  • MA 1252-PROBABILITY AND QUEUEING THEORY


  • B.E./B.Tech. DEGREE EXAMINATION, MAY/JUNE 2007.


  • Categories


    Submit Previous Years University Question Papers and make money from adsense revenue sharing program

    Are you preparing for a university examination? Download model question papers and practise before you write the exam.

    Watch TV Channels



    Contact Us    Editors    Privacy Policy    Terms Of Use   

    ISC Technologies. 2006 - 2008 All Rights Reserved.