2006 Jawaharlal Nehru Technological University B.Tech Civil II Year II Sem - RR220101 ( Reg. April / May'06 - Set 2) Building Planning and Construction Management Question paper
|
|
|
Code No: RR220101 Set No.2 II B.Tech. II Semester Regular Examinations, April/May -2006 BUILDING PLANING AND CONSTRUCTION MANAGEMENT (Civil Engineering) Time: 3 hours Max Marks: 80 Answer any FIVE Questions All Questions carry equal marks 1. How are building classified? Explain in brief the regulations for any three types of buildings. [16] 2. (a) Define Floor Area. In the calculation of Floor Area Ratio. List the areas which have to be included and excluded while calculating Floor Area Ratio. (b) Define Carpet Area. List the portions of building that have to be excluded while calculating carpet area. [8+8] 3. Design a Primary Health Center with following facilities. (a) Entrance and waiting space (b) Doctors consultation room 2 Nos. (c) Examination room (d) Operation Theatre (e) Medical store (f) Office (g) Laboratory (h) Family planning unit (i) Male wards for 10 beds (j) Female wards for 10 beds (k) Toilet blocks 2Nos. Draw a single line diagram with suitable dimensions. [16] 4. (a) Differentiate between natural ventilation and artificial ventilation. (b) Define ‘air changes’ and give the recommended air changes for the following. i. Kitchen ii. Cinema theater iii. Offices. [8+8] 5. Cement is used in a precast palnt at the arte of 30 tons per month. The cost of cement is Rs.2,600/- per ton. The ordering cost per order is Rs.125/- only and the holding cost including wastage and pilferage is about 4-5% of the average inventory cost. Estimate the economic order quantity of cement. [16] 6. Explain the basic concept of resource management. Support your answer with a flow diagram and an example. [16] 7. A project has the following schedule: Activity Time in weeks Predecessors A 4 None B 1 None C 1 A D 1 B E 6 B F 5 C,D G 4 E H 8 E I 1 G J 2 H K 5 I,J L 7 F Construct a PERT network and compute an early start, a late start and slack time for each activity. Find the critical path. [16] 8. Write short notes on : (a) Earth-moving equipment (b) Belts and conveyors. [8+8]
Attachments:
Return to question paper search
|
|
|
Submit Previous Years University Question Papers and
make money from adsense revenue sharing program
Are you preparing for a university examination? Download model question papers
and practise before you write the exam.