New Member FAQ | Forums | Earn Revenue


Resources Entrance Ask Experts Exam Papers Jobs English Projects Universities Colleges Courses Schools Training My India



My Profile
Active Members
TodayLast 7 Days more...



Awards & Gifts
Online Exams

Fresher Jobs


Our fresher job section is exclusively for fresh graduates! Find jobs for freshers in major Indian cities including Bangalore, Chennai, Hyderabad, Pune or Kochi

Resources


Find educational articles, blogs, discussion threads and other resources.

Colleges


Find details about any college in India or search for courses.

website counter



Download Model question papers & previous years question papers

Posted Date: 09 Aug 2009      Posted By: Rajesh       Member Level: Diamond

2009 Jntu hyderabad Code No: 37040 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD R05 IV B.Tech. I Semester Supplementary Exams, May/June – 2009 OPERATIONS RESEARCH (Mechanical Engineering and Mechatroniccs and Electronics and Telematics Engineering) Question paper



Course: B.Tech Mechanical Engineering   University: Jawaharlal Nehru Technological University




Code No: 37040
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
R05 IV B.Tech. I Semester Supplementary Exams, May/June – 2009
OPERATIONS RESEARCH
(Mechanical Engineering and Mechatroniccs and Electronics and Telematics Engineering
and Mechanical(Production)Engineering Automobile Engineering)
Time: 3 hours Max. Marks.80
Answer any Five questions
All questions carry equal marks
---
1. Solve the following problem by Big M method
Maximize Z = x1 + 2x2 +3x3 – x4
Subject to x1 + 2x2 +3x3 = 15
2x1 + x2 +5x3 = 20
x1 + 2x2 +x3 + x4 = 10
x1, x2, x3, x4 = 0. [16]
2. A product is produced by four factories A,B,C and D. The unit production costs in them are Rs 2,
Rs 3, Re 1 and Rs 5 respectively. Their production capacities are, factory A – 50 units, B – 70
units, C – 30 units and D – 50 units. These factories supply the product to four stores, demands of
which are 25, 35,105 and 20 units respectively. Unit transport cost in rupees from each factory to
each store is given in the table below
Stores
1 2 3 4
A 2 4 6 11
B 10 8 7 5
C 13 3 9 12
Factories
D 4 6 8 3
Determine the extent of deliveries from each of the factories to each of the stores so that the total
production and transportation cost is minimum. [16]
3.a. Solve the following traveling salesman problem
Cities 1 2 3 4 5
1 -- 16 18 13 20
2 21 -- 16 27 14
3 12 14 -- 15 21
4 11 18 19 -- 21
5 16 14 17 12 --
b. Four operators O1, O2, O3 and O4 are available to a manager who has to get 4 jobs J1, J2, J3, and J4
done by assigning one job to each operator. The time needed by different operators for different
jobs is given in the matrix below. How should the manager assign jobs so that the total time needed
for all four jobs is minimum? [16]
J1 J2 J3 J4
O1 12 10 10 8
O2 14 12 15 11
O3 6 10 16 4
O4 8 10 9 7
4. A company is planning to replace an equipment whose purchase cost is Rs 1, 00,000. The
operating and maintenance cost of the equipment during its first year of operation is Rs 10000 and
it increases by Rs 2000 every year thereafter. The resale value of the equipment at the end of the
first year of its operation is Rs 65000 and it decreases by Rs 10,000 every year there after. When
should the equipment be replaced if:
i. time value of money is ignored
ii. if discount rate is 12%.5.a. Explain principle of dominance with an example.
b. Solve the following game graphically. [8+8]
Player B
I II III IV V
Player A I 4 2 5 -6 6
II 7 -9 7 4 8
6a. Explain the characteristics of a queuing system.
b. A repairman is to be hired to repair machines which breakdown at an average rate of 3 per hour.
The breakdowns follow poisson distribution. Non-productive time of a machine is considered to
cost Rs 10 per hour. Two repairmen have been interviewed – one is slow but cheap, while the
other is fast but expensive. The slow repairman charges Rs 5 per hour and repairs machines at the
rate of 4 per hour. The fast repairman charges Rs 7 per hour and he repairs machines at an average
rate of 6 per hour. Which repairman should be hired? [8+8]
7. An electronic equipment contains 500 resistors. When any resistor fails, it is replaced. The cost of
replacing a resistor individually is Rs 20. If all the resistors are replaced at the same time, the cost
per resistor is Rs 5 . The percentage surviving S(i) at the end of month i is given in the table
Month i 0 1 2 3 4 5
S ( i) 100 90 75 55 30 0
What is the optimum replacement plan? [16]
8.a. Explain the characteristics and applications of dynamic programming.
b. Write short notes on simulation languages





Return to question paper search

Next Question Paper: Jntu hyderabad Code No: 37040 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD R05 IV B.Tech. I Semester Supplementary Exams, May/June – 2009 OPERATIONS RESEARCH (Mechanical Engineering and Mechatroniccs and Electronics and Telematics Engineering)

Previous Question Paper: Jntu hyderabad Code No: 37040 JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD R05 IV B.Tech. I Semester Supplementary Exams, May/June – 2009 OPERATIONS RESEARCH (Mechanical Engineering and Mechatroniccs and Electronics and Telematics Engineering)

Related Question Papers:


  • III B.Tech I Semester Regular Examinations, November 2005,HEAT TREATMENT TECHNOLOGY


  • IV B.Tech I Semester Supplementary Examinations, April/May 2005 POWER SEMICONDUCTOR DRIVES


  • Code No: 3220001 II B. Tech. II SEMESTER REGULAR EXAMINATIONS APRIL/MAY 2009 MANAGERIAL ECONOMICS AND FINANCIAL ANALYSIS [SET - 2]


  • APPLIED CHEMISTRY


  • jntu


  • Categories


    Submit Previous Years University Question Papers and make money from adsense revenue sharing program

    Are you preparing for a university examination? Download model question papers and practise before you write the exam.



    Advertise Here





    Contact Us   Advertise   Editors    Privacy Policy    Terms Of Use   

    ISC Technologies.
    2006 - 2009 All Rights Reserved.