My Profile
Active Members
TodayLast 7 Days
more...
Awards & Gifts
Online Exams
Fresher Jobs
Our fresher job section is exclusively for fresh graduates! Find jobs for freshers in major Indian
cities including Bangalore, Chennai, Hyderabad, Pune or Kochi
Resources
Find educational articles, blogs, discussion threads and other resources.
Colleges
Find details about any college in India or search for courses.
Advertisements
|
CTS
Posted Date: 27 Apr 2008 Resource Type: Articles/Knowledge Sharing Category: Placement Papers
|
Posted By: Girish Patil Member Level: Diamond Rating: Points: 5
|
|
|
|
CTS
JANUARY 9TH ================= 1. If [x] indicates integral of x i.e is the largest integer less than x and |x| indicates absolute value of x then what is the maximum value of [x]/|x|. A. 1 B. 0 C.-1 D. None of these Ans: A
2. In the above question what is the minimum value of [x]/|x|. A. 1 B. 0 C.-1 D. None of these Ans: D
(3-6) If the clock(Conventional clock with numbers from 1 to 12 in order) is cut into 3 pieces such that the sum of numbers on each piece are in Arithemetic Progression(A.P) with a common difference of 1.
3. What is the sum of even numbers in the group where 5 is present? A. 4 B.10 C.12 D.14 Ans: B
4. What is the produ ct of all numbers in the group in which 12 is present A. 212 B. 252 C. 244 D. None of these
5. What is the count of numbers in each piece. A. 2,2,5 B. 5,5,2 C. 3,4,5 D. 6,4,2 Ans: C
6. What is the sum of the numbers in the group wher 9 is present(excluding 9) A.12 B. 20. C.18 D.21 Ans C
7.
8. Avinash takes 15 days to complete a work and Bada takes 12 days to complete the same work. If they work in alternate days, In how many days they finish the work. A. 13 days B. 13 1/4 days C. 6 1/4 days D. None Ans:
9. There is a circular track of length 400 mts. If A and B Starts at the same point but in opposite direction with a speeds of 8 m/sec and 12 m/s respectively.Then at what time after the be gining they will meet for the second time. A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: C
10. In the above question when will they meet for the first time at the starting point. A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: A
11. If the vertices of the triangle are A(1,2), B(-2,-3) and C(2,3) then which is the largest angle? A. Angle(ABC) B.Angle(BAC) C.Angle(ACB) D.None Ans:B
12. If (-1,0), (0,-1) and (-1,-1) are three vertices of a square then what is the 4th vertex.
13. If [x] indicates integral of x i.e is the largest integer less than x and |x| indicates absolute value of x then find the value of [1.99]+[-2.99]+[1.03]+[2.50] A. 2 B.1 C.-2 D. -5 Ans: A
(14-15). Watch the below Algorithm for 4 digit number X. ; Step1: Add all the numbers Step2: If it is less than 10 STOP, else go to Step1.
14. If X=6724 then what is the end result after applying the above algorithm. A. 19 B.10 C.1 D. None Ans:C
15. If the 4 numbers are arranged in all possible orders then how many solutions are possible. A. ONE B. TWO 3.THREE 4. NONE Ans A
16. A trader frauds by 10% while buying and 10% while selling the same. What is the total gain he obtained during the transaction? A. 13 B.221/4 C.20 D.None of these Ans.
17. There are three cylinders with same height and surface area. If a new cylinder is created by me lting these three with the same height as before what is the surface area of the new cylinder when compared to that of the previous. A. 25% more B.50% more C.100% more D.None Ans.
18. If x=a then y=b except when x=b and y=a. If x=a, then p,q,r,s but when x not equal to a then p,q,r,s=e,f,g,h. If x=m or n then both charecters preeciding it and following it also equals the same with the precedence to the preceding charecter.
There r 5 questions based on the above.
(19-24) Based on Sentence completion.
(25-31) Based on passages. (Barrons GRE must be enough)
CTS CTS PAPER CONDUCTED ON NOV 6TH 2004 IN HYD COLOR CODE:WHITE --------------------------------- 40 QUESTIONS ---1 HOUR WITH A NEGATIVE MARKING OF 0.25 PER QUESTION ---------------------------------------------------------------------------------------------------------
1. If [x] indicates integral of x i.e is the largest integer less than x and |x| indicates absolute value of x then what is the maximum value of [x]/|x|. A. 1 B. 0 C.-1 D. None of these Ans: A
2. In the above question what is the minimum value of [x]/|x|. A. 1 B. 0 C.-1 D. None of these Ans: D
(3-6) If the clock(Conventional clock with numbers from 1 to 12 in order) is cut into 3 pieces such that the sum of numbers on each piece are in Arithemetic Progression(A.P) with a common difference of 1.
3. What is the sum of even numbers in the group where 5 is present? A. 4 B.10 C.12 D.14 Ans: B
4. What is the product of all numbers in the group in which 12 is present A. 212 B. 252 C. 244 D. None of these
5. What is the count of numbers in each piece. A. 2,2,5 B. 5,5,2 C. 3,4,5 D. 6,4,2 Ans: C
6. What is the sum of the numbers in the group wher 9 is present(excluding 9) A.12 B. 20. C.18 D.21 Ans C
7.
8. Avinash takes 15 days to complete a work and Bada takes 12 days to complete the same work. If they work in alternate days, In how many days they finish the work. &nb sp;A. 13 days B. 13 1/4 days C. 6 1/4 days D. None Ans:
9. There is a circular track of length 400 mts. If A and B Starts at the same point but in opposite direction with a speeds of 8 m/sec and 12 m/s respectively.Then at what time after the begining they will meet for the second time. A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: C
10. In the above question when will they meet for the first time at the starting point. A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: A
11. If the vertices of the triangle are A(1,2), B(-2,-3) and C(2,3) then which is the largest angle? A. Angle(ABC) B.Angle(BAC) C.Angle(ACB) D.None Ans:B
12. If (-1,0), (0,-1) and (-1,-1) are three vertices of a square then what is the 4th vertex.
13. If [x] indicates integral of x i.e is the largest integer less than x and |x| indicates absolute value of x then fin d the value of [1.99]+[-2.99]+[1.03]+[2.50] A. 2 B.1 C.-2 D. -5 Ans: A
(14-15). Watch the below Algorithm for 4 digit number X. Step1: Add all the numbers Step2: If it is less than 10 STOP, else go to Step1.
14. If X=6724 then what is the end result after applying the above algorithm. A. 19 B.10 C.1 D. None Ans:C
15. If the 4 numbers are arranged in all possible orders then how many solutions are possible. A. ONE B. TWO 3.THREE 4. NONE Ans A
16. A trader frauds by 10% while buying and 10% while selling the same. What is the total gain he obtained during the transaction? A. 13 B.221/4 C.20 ;D.None of these Ans.
17. There are three cylinders with same height and surface area. If a new cylinder is created by melting these three with the same height as before what is the surface area of the new cylinder when compared to that of the previous. A. 25% more B.50% more C.100% more D.None Ans.
18. If x=a then y=b except when x=b and y=a. If x=a, then p,q,r,s but when x not equal to a then p,q,r,s=e,f,g,h. If x=m or n then both charecters preeciding it and following it also equals the same with the precedence to the preceding charecter.
There r 5 questions based on the above.
(19-24) Based on Sentence completion.
(25-31) Based on passages. (Barrons GRE must be enough)
Plain Text Attachment [ Download File | Save to my Yahoo! Briefcase ]
hello Plzz help me to answer some technical & HR questions of CTS...... a) Transistor advantage over FET b) Use of DFT. c) Wheth er a DC source can be used to run a computer d) Storage class in C ? e) what type of I/O device is required for C. f) Application of the various bands in Satellite communication g) Process to convert a transistor to diode. h) effect of quantisation on the BW of a signal. Some typicals HRs..... i) how wud u like to spend 7 day holiday j) what u expect from CTS k) short term & long term goals l) How u can contribute from ECE to software m) Physical realization of Phase modulation.
CTS =================================================== CTS Paper of 8th November TIME= 60 mins QUES= 40 VENUE= Kolkata COLOR = Purple =================================================== (1) What is the co-efficient of the term independent of x in the series [ (1/2)(1/x)^1/3 +(1/x)^(-1/5)]^8. where ^ denotes "to the power of". (2) In an examination a student must answer 65% of the questions
correctly. But it was found t hat after answer 7 questions corretly out of the first 14, the student qualified. What is the min no. of questions in the paper. (a) 22 (b) 18 (c) 20 (d) Can't say (3) There r two jars. In the first jar there is 25%Milk and in the second jar there is 50% milk. What ratio of milk should be added to get 12 lit of milk from the two jars such that we get 62.5% Milk in the whole mixture. [Ans: 6lit : 6lit] (4) There r 8 envelops and 8 letters. What is the probability that the all the letters will be inserted in the correct envelop. (5) There r two bridges at a distance of 1Km. A person starts rowing upstream from 1st bridge and when he reaches the second bridge he losses his cap. After 15mins he realises it and turns bach and rows downstream and catches his hat at the bottom of 1st bridge. Find : The speed of boat in still water (6) Same problem but find the speed of the river (7) There are 1000 doors that are of the open-close type. When a person opens the door he closes it and then opens the other. When the first person goes he opens-closes the doors ion the multiples of 1 i.e., he opens and closes all the doors. when the second goes he opens and closes the doors 2, 4 6 8 respectively. Similarly when the third one goes he does this for 3 6 9 1 2 15th doors resly. Find number of doors that are open at last. [Ans: 31] (8) 40 people can do a work in 60 days. After every 10 days 5 persons keeps leaving the job. In how many days will the job be completed. (9) A square field is there of dim : 40 X 60 m. A 1 m path is surrounded on the field outside it. What is the area of the path. (10) x=2 + 2^(1/3) + 2^(2/3). Find the value of x^3 -6x^2 - 8x. Something like this we have to find the answer was 8. (11) There was a puzzle on 5 traders in the name Steel,wood,Timber....and they produce Steel, wood, timber ...and supply them to others but not to the manufacturer of it. For eg: Steel supplies Wood's Product to the r eciver of Timber. this was a comfusing puzzle. About 4 questions were from this part (12) A person starts from A to B. After 1hr his tyre gets punctured and he repairs it for 10 mins and travels the rest of the distant with 30km/hr and arrives 30 min late. had the puncture occured 30 Kms earlier he wud been only 15 mins late. Find the ditance betn. A & B and his intila speed. Beside these there were about 20 question on English like Fill in the blanks, passage with conclusion, passage with some questions, Questions on whether cond. A is sufficient to solve the problem, whether cond. B is sufficient to solve the problem, whether cond. A & B both r neccessary to solve the problem. Whether the problem cannot be solved with the two conditions given. I was surprised to see s many English portions in the paper very much unlike CTS.
1. If [x] indicates integral of x i.e is the largest integer less than x and |x| indicates absolute value of x then what is the maximum value of [x]/|x|. A. 1 B. 0 C.-1 D. None of these Ans: A
2. In the above question what is the minimum value of [x]/|x|. A. 1 B. 0 C.-1 D. None of these Ans: D
(3-6) If the clock(Conventional clock with numbers from 1 to 12 in order) is cut into 3 pieces such that the sum of numbers on each piece are in Arithemetic Progression(A.P) with a common difference of 1.
3. What is the sum of even numbers in the group where 5 is present? A. 4 B.10 C.12 D.14 Ans: B
4. What is the produ ct of all numbers in the group in which 12 is present A. 212 B. 252 C. 244 D. None of these
5. What is the count of numbers in each piece. A. 2,2,5 B. 5,5,2 C. 3,4,5 D. 6,4,2 Ans: C
6. What is the sum of the numbers in the group wher 9 is present(excluding 9) A.12 B. 20. C.18 D.21 Ans C
7.
8. Avinash takes 15 days to complete a work and Bada takes 12 days to complete the same work. If they work in alternate days, In how many days they finish the work. A. 13 days B. 13 1/4 days C. 6 1/4 days D. None Ans:
9. There is a circular track of length 400 mts. If A and B Starts at the same point but in opposite direction with a speeds of 8 m/sec and 12 m/s respectively.Then at what time after the be gining they will meet for the second time. A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: C
10. In the above question when will they meet for the first time at the starting point. A. 1hr 40 sec B. 20 sec C. 40sec D. 3hr 20 sec Ans: A
11. If the vertices of the triangle are A(1,2), B(-2,-3) and C(2,3) then which is the largest angle? A. Angle(ABC) B.Angle(BAC) C.Angle(ACB) D.None Ans:B
12. If (-1,0), (0,-1) and (-1,-1) are three vertices of a square then what is the 4th vertex.
13. If [x] indicates integral of x i.e is the largest integer less than x and |x| indicates absolute value of x then find the value of [1.99]+[-2.99]+[1.03]+[2.50] A. 2 B.1 C.-2 D. -5 Ans: A
(14-15). Watch the below Algorithm for 4 digit number X. ; Step1: Add all the numbers Step2: If it is less than 10 STOP, else go to Step1.
14. If X=6724 then what is the end result after applying the above algorithm. A. 19 B.10 C.1 D. None Ans:C
15. If the 4 numbers are arranged in all possible orders then how many solutions are possible. A. ONE B. TWO 3.THREE 4. NONE Ans A
16. A trader frauds by 10% while buying and 10% while selling the same. What is the total gain he obtained during the transaction? A. 13 B.221/4 C.20 D.None of these Ans.
17. There are three cylinders with same height and surface area. If a new cylinder is created by me lting these three with the same height as before what is the surface area of the new cylinder when compared to that of the previous. A. 25% more B.50% more C.100% more D.None Ans.
18. If x=a then y=b except when x=b and y=a. If x=a, then p,q,r,s but when x not equal to a then p,q,r,s=e,f,g,h. If x=m or n then both charecters preeciding it and following it also equals the same with the precedence to the preceding charecter.
There r 5 questions based on the above.
(19-24) Based on Sentence completion.
(25-31) Based on passages. (Barrons GRE is be enough)
Subject: MY CTS INTERVIEW EXP _ 23 sep Here is my interview experience with CTS held on 23rd sep - 6pm.Sorry for late coz i already sent it today morning(sep24) but it havent worked it seems.Its my second mail.Hope it gives u some idea.Have patience to read it ( bit elaborate ) like my 50 min long interview. I was scheduled for interview at 3 pm on thursday. I reached there by 1 pm , had my lunch at foodcourt of CTs.only Rs.10 for vasantha bhavan meals worth Rs.40. At 3 i was allowed to get into db2(Development block 2) where my interview held.till then we made to sit at the visitor waiting room near entrance.We filled up our HR form at ground floor HR office.At 4 divya(HR) called 2 people to interview room.(10 in 3pm batch only 8 turned). others were asked to wait at other HR section.At 4.15 my interviewer took myself and a girl to jp morgan development center at 4th floor.after waiting for other 15-20 min the girl got call and i was asked to stay there. She was interviewed for around 50 min and then i got call.At that time most of the employees are leaving after work.My interviewer came to my room and called me saying sorry for the long wait.I said its cool here waiting in an A/C room than the sultry outside.He smiled at me and i got into interview room by 6pm.There r 2 in my panel. To say abt interviewer they introduced themselves.I introduced myself with a firm handshake.My first questions is introduce urself.I said abt schooling,family,hobby..Here starts my tech section with questions fired with no gap between my answer and next question.Interviewer seems very strong(sariyana mandai) in all areas.I said my area of interest as OS,networking.i got qs frm C,SQL,OS,DBMS,Networks,OOPs,Microprocessor... TECH QUESTIONS that i remember: What is an OS? Types of Os? Deadlock? Deadlock detection? what is batch file? Multiprocessing? segments,paging? Page fault? how virtual memory implemented? Thrashing? Memory leakage?(i said its something deals with memory wastage but no idea sir) Semaphore? P() v() conditions.. u designed ur college website did u know j2ee , scripting? ( I have no idea abt j2ee I used tools to design a website) What tools (dream weaver,fireworks) Whats ur collegesite address ( our old college site is not yet updated with mine but one I designed is at www.adhiparasakthienggcollege.tk) What is Datastructure? Stack? which is FIFO and LIFO ? (queue and stack respectively) Linklist? dangling pointer? Types of sorting? Explain heap sort? y link list rather than array? (my ans is - max memory usage through pointers in link list, easy to insert and delete) What is normalisation? Types? -i explained first normal form he said proceed with 2nd,3rd,BCNF,fourth normal form...i said all but confused abt fifth normal form..) What is RDBMS and compare with DBMS? Explain OSI what is open system in network? ( system which has nodes communicate independent of underlying architecture) what is a microprocessor? (my ans-a programmable electronic device with memory and processes input data) What is OPCODE? Diff between C & C++? which is faster c r c++? What is a JOIN types of join explain equi join? innerjoin, outerjoin left join outer join what i in oracle8i stands for ? internet i may left some questions but every questions r fundamentals only. No questions on Proj as mine is an application in VC++. No question frm Software engg (for me) PROGRAMS AND SQL While i am answering tech questions simultaneously he wrote questions in a sheet 1.Swap two nos without third var(temp) swap(a,b) { a=a+b;b=a-b;a=a-b; } 2.Example for operator overloading 3.example for Multiple inheritance he drawed two tables emp and dept and asked for 4.Find the nth max frm sal in emp table? ( i tried with MAX() in sql but couldnt get it right) 5.equijoin emp and dept table 6.Left and right join emp and dept table ( I said i lost in touch with SQL but tried) Then started my HR questions same person. The person who called me was silent but noting down something on a sheet while other firing questions in a very fast phase…as it is 6.45 pm then. HR: U wrote ur short term plan as learning but I need a proper thing r ur career plan I: for first sixth month I may be in trainee later would be an analyst. HR: Long term.. I : Willing to pursue my magerial degree and to promote to managerial position in next five years. HR: ur hobby is cooking, browsing and reading magazines. What kind of magazines and sites I : Riders digest, India today,The week, and anada vikatan etc., HR: Regarding sites state a few I : santabanta for entertainment, Times of India.com for news, W3schools.com for tutorials,webopedia.com for tech terms,google and a9.com for searching. WHAT u did for last 4 months? ( i applied for more than 80 companies and took written for infosys,ibm,CTS,iGATE,L-cube and i went upto hr interview in iGATE.) -its lie actually i got placed in igate in june16 selection at easwari engg college walkin and got my joining date last week as MARCH 2 2005.yes another 5 months to go.So is the answer.Dont say if u got offer frm any other firms. Say me abt CTS? blah blah info frm www.cognizant.com CEO of CTS? Mr.Lakshmi Narayanan Y CTS? I want to celebrate work HR: What is the Latest tech in IT? I : The latest tech which hogs limelight is J2ee and datawarehousing HR: I asked technology .. I : RFID – Radio frequency identification and explained in a few lines HR: Latest News I : I said abt umabharti issue, US visit of pm, windies match ,jayalakshmi issue…. I read last weeks THEWEEK cover story of sunset of Silicon Valley? abt IT companies are now in mood of moving to Chennai,pune rather than bangalore….(he was impressed) HR : did pm met bush r blair I : I said I got confused sir I am not clear as both pm and president on tour.(he laughs) That’s it ..Its 7 when I came out of interview room. Results would be announced on sat 25 sep by mail. My hopes r high for a positive result.I answer almost all questions but couldnt answer 3 sql questions alone but tried. I am praying. Hope I covered all possible information. TIPS : Be concise in answer as questions r linked frm ur answer. Don’t worry if u do know any.They look into ur overall performance. DON’T PANIC. Not all will have such a long session of interview. It happens sometimes be prepared .Don’t settle with area of interest alone.Be confident. =========================
hi friends, how are u ,I experienced mine first technical interview in CTSI wanted to help out those who are preparing for the interview at CTS,I had attended the interview on 19th of this month.It was for 20min.there were two people one lady and other gent had interviewed me both HR and Tech. when I entered in the room I was called by the interviewer and first introduced himself and given well shakehand and later lady HR introduced herself and asked me to sitdown. later they started asking questions . since it was mine first interview I was in tense but it is cool, first they started asking questions on tell about yourself, I said starting from up career and ended with my project done , later they asked how many sisters or brothers do u have? later they started asking questions on project mean what is ur project explain it and then they will ask about their queries on project to explain further and its uses and then any interests or achievements u have then simple HR quesion like would u like to be relocated to any place ? and then why u have chosen this field ? I answered slowly and they satisfied and then what u know they asked I said i know C and DS they asked abt to tell def of various linked lists then they asked how much u rate in C I replied 7/10 then they asked one statement output in which the string in printf means what will be the output I answered the same string will be the output and then they asked mine certificates and resume but they again questioned on project i answered i have done mine project in C platfor m since mine project is both of type hardware and software and then they said mine interview was over and i will get the result after one week In the beginning u were asked to fill a form like
what r ur short term and long term goals with the CTS? >What a Software professinal requires to succeed in the corporate world?What contributions can u make to succeed? >What do u expect from CTS? >Your achievements,hobbies,interests? > Ur area of interests.. >Thats it guys be cool and answer legibly
|
Responses
|
No responses found. Be the first to respond and make money from revenue sharing program.
|
|
|