My Profile
Active Members
TodayLast 7 Days
more...
Awards & Gifts
Online Exams
Fresher Jobs
Our fresher job section is exclusively for fresh graduates! Find jobs for freshers in major Indian
cities including Bangalore, Chennai, Hyderabad, Pune or Kochi
Resources
Find educational articles, blogs, discussion threads and other resources.
Colleges
Find details about any college in India or search for courses.
Advertisements
|
How Electro-magnetic Overload Relay works?
Posted Date: 16 May 2008 Resource Type: Articles/Knowledge Sharing Category: Education
|
Posted By: prasanna Member Level: Gold Rating: Points: 1
|
|
|
|
Overload Relays are used to protect Electric Motor from failure due to high current drawn by motor.Electric motor has 33% of it's cost in total Air Compressor unit,so it is our duty to protect Electric Motor from any type of failure.Overload Relays are the only solutation to protect motor from high current.Overload Relays are generally of two types one is "Electro-magnetic" and another is "Thermal".
I have already given details about Thermal Overload Relay in past.In this post,you will find details about "Electro-magnetic Overload Relay" which is somewhat outdated now a days,but still some old Air Compressor units are having these type of Relays.
The Electro-magnetic Overload Relays consist of a coil or solenoid carrying the line current (or a portion of it through current transformers) with an armature which when attracted sufficiently operates the release circuit or latch.A time lag feature is in corporated to guard against unnecessary operation from temporary Overloads due to the normal operation of the machines which are being driven.Time lag is obtained by means of Dash pot (otherwise the action would be practically instantaneous) fitted to the Oil Circuit Breaker (OCB) controlling the stator circuits.
Construction and Adjustment of Dash pot.
The time lag consist of BODY CASTING,MOVEABLE PLUNGER,OIL RETAINING SCREW CUP.The moveable plunger comprises the core of the Overload release,to which is fitted a specially shaped brass disc moving in a restriction in the body casting,by turning the screw cap the position of the disc within the restriction is varied.
The time lag are despatched dry and must filled with special time lag oil (SAE-60 grade) provided in seperate containers in the Circuit Breaker.While fitting remove screw "A".It is not necessary to remove the bottom cup "B" and on no account should screw "C" be removed.Adjustment of the Overload setting is made by slackening screw "D" and sliding the body casting up or down,until the top face coincides with the calibration marking required on the calibration tube,screw "D' is then tightened.The bottom rotatable cup "B" is now described reset themselves after operation within few second.
This type of Overload Relays are very simple in operation but due care must taken for accurate operation.All the marks "A","B","C"&"D" are embossed on respective spaces,you have to indentify first before working on "Electro-magnetic Overload Relay".
For more details, visit http://www.pnengineering.blogspot.com/
|
Responses
|
No responses found. Be the first to respond and make money from revenue sharing program.
|
|
|