512105 Elective II b) Well Planning and Design Teaching Scheme: Examination Scheme: Lectures: 4 Hours/Week Paper: 100 Marks Duration: 3 Hours
Collection and preparation of data for well planning, Prediction of pore pressure and fracture gradient, Selection of well location, well trajectory, hole geometry and casing seats, Bit, mud, casing and cement plan, Completion effects on well planning, Rig sizing and selection, Well cost estimation and AFE preparation Well selection, reservoir evaluation, costing AFE selection, geological input, testing and completion requirement, drilling consideration, Well plan organization and data gathering, Well Dynamics,Rig design consideration
Reference Books Borgoyne, A. T., Chenevert, M. Milheim, K., Young, F. S.: Applied Drilling Engineering, SPE Textbook Series, 1985. Denis Perrin, “Well Completion and Servicing” ISBN 2-7108-0765-3 Economides M et al. Editor by Petroleum Well Construction John Wiley and Sons, 1998 Craft B.C et al "Well Design - Drilling and Production”. Prentice-Hall, 1962, Schechter R.S., “Oil Well Stimulation” Prentice Hall,1992 Supplemental papers from the literature Reference http://www.unipune.ernet.in/stud_info/Syllabi/Syllabus_2008.html
|
No responses found. Be the first to respond...
|